Microtunnelling and HDD – what’s the difference?

2020-01-28T15:13:18+10:00April 24th, 2019|

All too often, project managers will choose a pipeline installation method simply because they’ve used it more often in the past or it’s cheaper, when in reality a different approach could be far better suited for the job. Both microtunnelling and horizontal directional drilling (HDD) are trenchless installation methods used in a wide variety of projects. Choosing the best one for your project could be the difference between a painless, streamlined installation, and a job that drags over-budget and time, and is more likely to have problems in the future. Identifying the ideal method can be as simple as remembering a few key differences between microtunnelling and HDD.

Go to Top